Probuildero — Subcontractor Portal · Metro Framing Probuild ero Trade Partner Portal Signed in as Metro Framing Corp Cold-Formed Framing · 2 assigned projects My Work 3 My Scope Drawings & Specs Submittals 1 RFIs My Schedule PK P. Kowalski Metro Framing · Foreman My Work Interactive Demo · Youtiva Assigned Projects 2 Astoria Mixed-Use · Lenox Hill Townhouse Needs Your Action 3 1 upload due · 1 schedule notice · 1 document expiring Approved & Cleared SUB-019 Astoria shop drawings — approved as noted, proceed per notes Waiting on You Lenox Hill Upload framing shop drawings — SUB-048 Due Jul 24 to hold your August start. Upload here — it routes to the architect automatically. Upload Now Astoria Schedule notice — framing start moved to Mon, Jul 21 Engineer response pending on a steel detail (not your item). New start date is firm from Probuildero. Please confirm crew availability. Confirm Crew for Jul 21 Insurance certificate expires Sep 12 Your COI must stay current to remain on active projects. Upload the renewal when your broker issues it. Upload Renewal COI Astoria Mixed-Use Start Jul 21 Your cold-formed framing is 70% complete — floors 1–2 done, floor 3 next phase. Shop drawings approved as noted (see SUB-019 notes on track spacing at shaft walls). Next phase starts Monday Jul 21, 7:00 AM — site access via Ditmars gate, material hoisting booked for the morning. Lenox Hill Townhouse Prep Phase Framing scope awarded; your work follows the structural steel, targeted mid-August . One item on you now: SUB-048 shop drawings due Jul 24. Landmark-district condition — verify existing joist pockets before fabricating perimeter track (see spec notes). You see your scope on your projects — assignments, drawings, submittals, and schedule. Budgets, contracts, other trades, and other projects aren't part of your view. Astoria Mixed-Use — Your Scope PB-2024-031 Scope Item Status Cold-formed metal framing — floors 1–3, spec 05 40 00 70% — In Progress Shaft wall assemblies at stair & elevator cores Floor 3 remaining Rooftop bulkhead framing Upcoming Backing & blocking per architectural details Trailing floors Working notes from approval: SUB-019 approved as noted — reduce track fastener spacing to 12" o.c. at shaft walls; deflection track at all slab-soffit conditions. Lenox Hill Townhouse — Your Scope PB-2024-027 Scope Item Status Cold-formed framing — cellar through roof, spec 05 40 00 Awarded — Aug start Furring at existing party walls (landmark condition) Awarded Shop drawings — SUB-048 Due Jul 24 Pre-fabrication condition: field-verify existing joist pockets at party walls before ordering perimeter track — dimensions on the 1928 drawings are not reliable. Your Company Documents on File Document Status Valid Through Certificate of Insurance — GL & Umbrella Renewal Needed Soon Sep 12, 2026 Workers' Compensation Certificate Current Jan 31, 2027 W-9 On File — Signed Subcontract Agreements (2) Executed — Astoria — Your Drawing Set Framing-relevant · Rev-controlled Sheet Title Rev S-201 Framing Plans & Steel Details 3 Open A-101 Cellar & 1st Floor Plans 4 Updated Jun 12 Open A-102 2nd & 3rd Floor Plans 4 Updated Jun 12 Open A-501 Partition Types & Details 3 Open What changed in Rev 4: corridor partitions on floors 2–3 shifted 4" north at gridline B — affects your top-track layout on floor 3 only. The change summary is attached to each sheet. Specifications — Your Sections Section Title 05 40 00 Cold-Formed Metal Framing Open 09 22 16 Non-Structural Metal Framing Open 06 10 00 Rough Carpentry (backing/blocking) Open Always the current revision — if a sheet you've downloaded is superseded, you're notified automatically. No more building from an old set. SUB-048 — Framing Shop Drawings (Lenox Hill) Due Jul 24 Upload your fabrication drawings for the Lenox Hill framing package. On upload, the submittal routes to Marchetti Architecture for review automatically — you'll be notified the moment it's returned. Tap to Upload Shop Drawings PDF or DWG · routes to architect on upload Your Submittal History # Item Project Reviewer Status SUB-048 Framing Shop Drawings Lenox Hill Marchetti Architecture Submitted — In Review SUB-019 Cold-Formed Steel Framing Shop Drawings Astoria Marchetti Architecture Approved as Noted SUB-011 Framing Connector & Fastener Schedule Astoria Kalman Structural Approved Approved as noted means proceed with the notes incorporated — the reviewer's markups are attached to SUB-019. No calls needed to find out where your submittal stands. Ask a Question — New RFI Hit a field condition or a drawing conflict? Submit it here — it routes to the right reviewer with your photos attached, and the answer comes back to this page, on the record. + New RFI Attach Field Photos Draft — RFI from Metro Framing Top-track condition at Rev 4 corridor shift, floor 3 gridline B The 4" partition shift on A-102 Rev 4 puts the corridor top track at the edge of the deck flute. Confirm attachment detail — deflection track per S-201 detail 7, or supplemental angle? Submit to Architect Affecting Your Work # Subject With Impact on You Status RFI-016 Top-track condition at Rev 4 corridor shift Marchetti Architecture Floor 3 layout Submitted RFI-014 Steel connection detail at grid line C Not your item Kalman Structural Sets your Jul 21 start date Awaiting Engineer RFI-009 Stud gauge at 12'-6" partition runs — Answered — 16 ga confirmed Answered You can see what's holding up your start — RFI-014 is with the engineer, not with you, and your date updates here the moment it's answered. No calling the office to ask. Your Dates — Both Projects Updates automatically Project Your Activity Date Status Astoria Framing phase 3 — mobilize floor 3 Mon Jul 21 · 7:00 AM Confirmed date — was Jul 17 Astoria Material hoisting window (booked) Jul 21 · 7:00–11:00 AM Reserved Astoria Shaft wall completion — floor 3 Target Aug 08 Planned Lenox Hill Shop drawings due (SUB-048) Jul 24 On You Lenox Hill Framing start (follows steel) Mid-August Tentative When a date moves, this page moves with it — and you get a notification with the reason. No group texts, no calling to double-check.